Our Clients

Companies We Work For








Explore

Our Completed Projects

  1. CLIENT : DESCON ENGINEERING
    PROJECT : ENGRO CHEMICAL, DAHARKI
    JOB: PIPING & PIPE SUPPORTS FABRICATION, WELDING, ERECTION & HYDROTESTING.
    JOB: BAGING PLANT SS HOPPER FABRICATION, WELDING & ERECTION.
  2.  CLIENT : CHINA CPECC (CHINA PAETROLEUM ENGINEERING & CONSTRUCTION CORP.)
    CLIENT: SACHAL ENGINEERING PRIVATE LTD
    PROJECT : KANDHKOT FIELD GAS COMPRESSION STATION, KANDHKOT, PPL
    JOB: STEEL STRUCTURE FABRICATION AND ERECTION OF COMPRESSOR SHED, WORKSHOP SHED & GENERATOR SHED.
  3. CLIENT : CHINA CNCEC
    CLIENT : PAK-ARAB ENGINEERING CO.
    PROJECT : FATIMA FERTILIZER, SADIQABAD.
    JOB : UNDERGROUND PIPING, FIRE WATER & COOLING WATER PIPING, FABRICATION, ERECTION, WELDING, HYDROTESTING, EXEVATION & BACKFILLING.
  4. CLIENT : PROGRESSIVE ENGINEERING,
    PROJECT : KUNDIAN CHEMICAL INDUSTRY, CHASHMA BARAGE, MIANWALI
    JOB : CS, SS PIPING FABRICATION, WELDING, ERECTION & HYDROTESTING.
  5. CLIENT : EITMAAD ENGINEERING (PVT) LTD.
    PROJECT : PROCTOR & GAMBEL PAKISTAN LTD, PORT-QASIM.
    JOB : CS, SS PIPING FABRICATION, ERECTION & HYDROTESTING.
  6. CLIENT : ALFA LEVEL
    PROJECT : DHA WATER DESALINATION PLANT
    JOB : HEAT EXCHANGER, PIPING FABRICATION, WELDING & ERECTION PIPE RACK STEEL STRUCTURE.
  7. CLIENT : AL-TARIQ CONSTRUCTION (PVT) LTD.
    PROJECT : BOSICOR OIL REFINERY, HUB.
    JOB : OIL STORAGE TANK SCALE GAUGE SYSTEM.
  8. CLIENT : BOSICOR OIL REFINERY, HUB
    PROJECT : BOSICOR OIL REFINERY, HUB.
    JOB : PIPING FABRICATION, WELDING, ERECTION & HYDROTESTING STRUCTURE ANNUAL CONTRACT.
  9. CLIENT : METAL ENGINEERING (PVT) LTD.
    PROJECT : OGDCL BOBY GAS FIELD
    JOB : OIL STORAGE TANK s SCALE GAUGE SYSTEM
  10. CLIENT : INTERNATIONAL FABRICATION COMPANY
    PROJECT : OGDCL THORA & CUNNER GAS FIELD
    JOB : 03 Nos. STEEL STORAGE TANKS (DIA50 ft & HEIGHT 40 ft).
  11. CLIENT : PETROCON ENGINEERING COMPANY
    PROJECT : GUL AHMED POWER HOUSE, KORANGI, KARACHI.
    JOB : PIPING FABRICATION, WELDING, ERECTION & HYDROTESTING.
  12. CLIENT : PETROCON
    PROJECT : TOTAL PARCO LUBRICANTS, PORT QASIM, KARACHI
    JOB : STORAGE TANK S STRUCTURE & PIPING.
  13. CLIENT : DHA( DEFENCE HOUSING AUTHORITY)
    PROJECT : DHA WATER DESALINATION PLANT
    JOB : SHUTDOWN JOB
  14. CLIENT : OIL & GAS DEVELOPMENT CORPORATION
    PROJECT : OGDC BOBY GAS FIELD (TANDO ADAM)
    JOB : PIPE LINE (DIA 12 inch).
  15. CLIENT : BRITISH PETROLEUM
    PROJECT : MOBILE SQUARE TANK SADDLING & HOLDING,
    JOB : HOLDING SETTELING STORAGE TANK.
  16. CLIENT : EKL (ENGINEERING KINETICS (PVT) LTD).
    PROJECT : D G CEMENT, CHAKWAL
    JOB : STEEL STRUCTURE FABRICATION & ERECTION.
  17. CLIENT : CHINA BUILDING MATERIAL INDUSTRIAL CORPORATION
    PROJECT : GHAREEBWAL CEMENT FACTORY, CHAKWAL
    JOB : STEEL STRUCTURE AND DUCT FABRICATION.
  18. CLIENT : EKL (ENGINEERING KINETICS (PVT) LTD).
    PROJECT : MAPLE LEAF CEMENT FACTORY, MIANWALI
    JOB : STEEL STRUCTURE FABRICATION & PAN CONVEYOR ERECTION.
  19. CLIENT : CHINA BUILDING MATERIAL INDUSTRIAL CORPORATION
    PROJECT : BEST WAY CEMENT, LINE II PROJECT, CHAKWAL
    JOB : STEEL STRUCTURE AND DUCT FABRICATION.
  20. CLIENT : ATLAS HONDA, KARACHI
    JOB : STEEL STRUCTURE, VESSEL & TANK.
  21. CLIENT : HASEEN HABIB CORPORATION(PVT) LTD
    PROJECT : NESTLE MILK PACK PLANT, KARACHI
    JOB : CS PIPING, FIRE SPRICNALER SYSTEM, FIRE FIGHTING PIING & HYDRENTS.
  22. CLIENT : DYNAMICS ENGINEERING
    PROJECT : COLGATE PALMOLIVE, KOTRI
    JOB : STEEL STRUCTURE ERECTION, MS & CS PIPING,
    SS & CS STORAGE TANKS